Data Centre West of Clive
- Capacity
- 19.8 MW
- Investment
- Not publicly confirmed
- Score
- 28 / 100
- Checked
- Sep 11, 2026
Capacity basis: Proposed on-site generation (MW)
DC Intel assessment
Speculative
Why
Specific 4.3-acre site and 19.8 MW modular gas-to-compute design are documented.
Risk
Latest confirmed AUC application closed without a decision, weakening the power pathway; sponsor/customer/finance visibility is low.
Watch
A new/active power approval application and municipal construction authorization.
Power strategy
Proposed 19.8 MW on-site natural gas generation with biofuel capability.
An AESO request is not an allocation.
Score
Sponsor Quality 6 / 15
Site & Approvals 9 / 20
Power Certainty 4 / 25
Commercial Commitment 3 / 20
Execution Evidence 6 / 20
Total 28 / 100
Scoring method. Not a credit rating or investment advice.